Challenge
Certify that a structure was fit for duty to provide structural reinforcement during an offshore well abandonment operation.
What We Did
Checked for static and dynamic strength of the structure
Analysed the structure for failure due to buckling and yielding
Met the required tight deadline
(Click on each picture to show full size)
Benefits to Our Client
The broken pipe was safely removed from the seabed
No cost penalties were incurred
Workers' safety was ensured
No pollution resulted from the project
|
|